After dabbling into MEP, I feel comfortable enough to move on and finish the model in greater detail. I was able to fix the roof into one single entity, as well as detail it with a standing metal seam profile. Downspouts, though not completely accurate in design, were placed along the new gutters. The model just looks so much nicer than before.
I will continue to finish up a few last minute details, but am looking to continue into Navisworks to begin some Clash Detection and sift through them to locate truly cost-worthy items. The only other major item I would need to tend to is the Site topography and detail. Everything else seems in place enough for takeoff to begin.
No comments:
Post a Comment