Beginning MEP has proven more challenging than I thought it would be. Deciphering the plumbing to apply to our thesis assignment standards was questionable, and I am awaiting reply for confirmation on what I should include in the model. Until that time, I have begun the HVAC system.



The "auto link" feature, though useful in practice, is not applicable to my project as the ducts vary in size continuously. For now I am simply constucting the basic outline and mirroring elements along different axis to line up in each room. Though there are a few snags along the way, the general idea is coming along.